No fixed infrastructure
Deploy on a prepared floor without building expensive fixed routes.
Robotic, Flexible Sorting
Rotonix has advanced the concept of robotic sorting with its autonomous Robobelt robots. Instead of fixed infrastructure, the sorting center of the future runs on intelligent robots; all it takes is an empty floor and a few days to install. Each robot positions itself using an onboard camera and 2D barcode scanning, requiring far less investment than traditional equipment.
Rotonix has advanced the concept of robotic sorting with its autonomous Robobelt robots. Instead of fixed infrastructure, the sorting center of the future runs on intelligent robots; all it takes is an empty floor and a few days to install. Each robot positions itself using an onboard camera and 2D barcode scanning, requiring far less investment than traditional equipment.
Sites with uncertain growth, seasonal peaks, short deployment windows, and frequent destination or layout changes.
Autonomous robots combine floor mapping, barcode scanning, and fleet control to find every destination.
Reference points and movement zones are defined across the facility floor.
The robot reads the parcel identity and receives its mission.
The fleet prioritizes routes and carries parcels between induction and output.
The Robobelt mechanism releases the parcel at the assigned chute or zone.

Deploy on a prepared floor without building expensive fixed routes.
Start operations faster when launching a site or absorbing a peak season.
Increase throughput by adding robotic units instead of rebuilding the center.
Final project values are confirmed after product, capacity, and site-layout analysis.
A prepared floor and safe movement zones are required; fixed conveyor routes and major building work are not.
Add robots, stations, or destinations and update fleet missions to scale throughput in stages.
Update the map and reference points in software so the fleet can calculate new routes.
Fleet control coordinates route priority and safe zones, while onboard sensors provide safe stopping.
Final pricing depends on throughput, number of exits, site layout and the level of software integration. After a site visit or online review, we provide a transparent quotation covering equipment, installation and commissioning.
In comparable projects, payback has typically been 12 to 24 months; the exact figure depends on your processing volume, current automation level and labor costs.
Don't let sorting errors or product damage undermine your productivity. Get in touch with the Rotonix team today.
Sorter build
100% Local