More peak capacity
Process high parcel volumes without creating induction or discharge bottlenecks.
The Fastest Fully Automated Sorting
The Rotonix Crossbelt Sorter delivers fully automated sorting across postal hubs, courier services, e-commerce, and distribution. The system is built from two large, perpendicular belts that handle a wide range of products at high speed, with exceptional accuracy and safe transfer. Its modular design adapts to the dimensional constraints of any facility.
The Rotonix Crossbelt Sorter delivers fully automated sorting across postal hubs, courier services, e-commerce, and distribution. The system is built from two large, perpendicular belts that handle a wide range of products at high speed, with exceptional accuracy and safe transfer. Its modular design adapts to the dimensional constraints of any facility.
High-density hubs with many destinations, a mixed item profile, and stable operation across long shifts.
Each independent carrier moves a parcel from induction to the correct output with minimal handling.
The parcel is placed on the induction unit and its barcode is captured.
Central control selects the output and discharge timing for the carrier.
Carriers move around the track at a controlled speed and spacing.
The cross belt transfers the parcel to its chute without impact.
Process high parcel volumes without creating induction or discharge bottlenecks.
Route every parcel to the right destination with real-time scanning and control.
Add cells and destinations through the modular line architecture.
Final project values are confirmed after product, capacity, and site-layout analysis.
It fits facilities that require high throughput, many destinations, and stable accuracy. Final capacity is based on the item profile.
Parcels up to 1,500 mm and 80 kg can be evaluated; parcel shape and base condition must be tested during design.
The modular architecture allows additional chutes, cells, and routing logic to be introduced in an expansion phase.
Induction scans, carrier-position control, and discharge event logs provide end-to-end traceability and error analysis.
Final pricing depends on throughput, number of exits, site layout and the level of software integration. After a site visit or online review, we provide a transparent quotation covering equipment, installation and commissioning.
In comparable projects, payback has typically been 12 to 24 months; the exact figure depends on your processing volume, current automation level and labor costs.
Don't let sorting errors or product damage undermine your productivity. Get in touch with the Rotonix team today.
Sorter build
100% Local